Send us the plans.
We'll engineer the layout.
Photometric layouts, light level verification, and product specifications matched to your facility. At no cost for Jarvis product projects.
2-3 days
Typical turnaround
No cost
Jarvis product projects
IES
Code-ready documentation
What our engineering team produces
Photometric layout
Foot-candle grid overlaid on your floor plan or site drawing. Shows light distribution, uniformity ratios, and mounting positions for every fixture.
Compliance documentation
Lighting power density calculations, IES code verification, and summary reports formatted for permit submittals and rebate applications.
Product specification
Complete fixture schedule with model numbers, wattages, lumen output, color temperature, and mounting details. Ready to hand to your electrician.
See what you'll receive
Real photometric analyses produced by our engineering team - from color-mapped light distributions to code-ready foot-candle grids.
3D light distribution analysis
Color-mapped intensity visualization across the project site
Site perspective view
Isolux contours overlaid on the actual lot
Foot-candle grid
Point-by-point values for code compliance verification
From your plans to a verified layout
You submit
Floor plans, site drawings, target light levels. Whatever you have.
TODAYWe confirm
Your project contact acknowledges receipt and asks any clarifying questions.
SAME DAYWe engineer
Product selection, photometric analysis, and compliance verification.
2-3 DAYSYou receive
Layout, fixture schedule, and compliance docs. In your inbox, ready to use.
IN YOUR INBOXWhat to include
The more detail you provide, the more accurate the layout. But don't wait until everything is perfect. We can work with what you have.
Floor plans or site drawings
PDF, CAD, or even a photo of a hand sketch. Dimensions marked are ideal.
Space dimensions
Ceiling or mounting height, room/area dimensions, obstructions if applicable.
Target light levels or code requirements
Foot-candle targets, IES recommendations, or specific energy code (IECC, ASHRAE, Title 24).
Existing fixture info (retrofits)
Current fixture types, quantities, and wattages. Helps us show the before/after comparison.
Good to know
Submit your project
Your plans are in our engineering queue.
A Jarvis engineer will review your submission, confirm scope, and reply with timeline details within a few business hours.
Need a full project package with pricing and incentive documentation? Start a project instead.
